Company Profile
Ru Ru Jalbidhyut Pariyojana Limited obtained survey license of capacity 5000kW from Department of Electricity Development (DoED) for development of Upper Hugdi Khola Hydropower Project located at Hugdi Khola Chandrakot Gaupalika Gulmi district. Upper Hugdi Khola Hydro Power project developed and operated by Ru Ru Jalbidhyut Pariyojana Ltd [RURUJPL]. This project is a run off river type hydropower project with generating capacity of 5 MW.RURUJPL run the project and sells electricity to Nepal Electricity Authority. Project Commercial Operation (COD) date is 2071 Chaitra 09, and the power generated from the project is evacuated to Birbash substation in Gulmi district.
P/E RatioN/A
Market Cap3.77B
Volume Traded8.9M
AI Technical Analysis
Daily OutlookRSI (14)54.20Neutral
MACDBullishPositive Crossover
BollingerMiddleTrading Range
ADX22.50Weak Trend
Last Updated: 26-02-03 14-59-59 | Shares Traded: 13418
Want Deeper Analysis?
Unlock AI-powered buy/sell signals, detailed financials, and real-time alerts for RURU.
Open in Mobile App