Company Profile
The Likhu-IV Hydroelectric Project is planned as a run-of-river scheme with an installed capacity of 52.4MW utilizing a design discharge of 26.70m3/s and gross head of 221.27 meters.
P/E RatioN/A
Market Cap19.59B
Volume Traded186.6M
AI Technical Analysis
Daily OutlookRSI (14)54.20Neutral
MACDBullishPositive Crossover
BollingerMiddleTrading Range
ADX22.50Weak Trend
Last Updated: 26-11-02 14-59-59 | Shares Traded: 322265
Want Deeper Analysis?
Unlock AI-powered buy/sell signals, detailed financials, and real-time alerts for GVL.
Open in Mobile App